d-automation

QA & compliance brief

QA & compliance brief (system description for qualification)

System description, controls and test evidence of d-dispensing as an input document for your risk-based qualification.

Document status
Draft. This document describes system boundaries, controls and test evidence of d-dispensing as an input document for the operator's risk-based qualification. It is not a validation statement and claims no compliance. Regulatory references at chapter/principle level; have QA/Regulatory review before release. Complete [Engineering] items from README/code.

1. Purpose and scope

d-dispensing is a guided dispensing terminal for the manual weigh-out of starting materials against a bill of materials in batch manufacturing (pharma, cosmetics, detergents). It delivers the dispensing record as part of the batch record; it is not an electronic batch record (EBR), not an MES and not a recipe management system.

Division of responsibility
D-Automation provides software, system description, test evidence and change information. Qualification in the operating environment (Annex 15, GAMP 5), assessment against Annex 11 / 21 CFR Part 11, SOPs (including second-person check), master-data maintenance, scale calibration and user management rest with the operator.

2. System description

2.1 Components

ComponentFunctionGMP relevance
Site server (1/plant)ERP/WMS integration, tolerance checks, booking transaction, audit trail, licence check, serves the UIHigh – location of decision logic and audit trail
Station agent (1/scale)Scale and printer connectivity, durable local store (outbox), update verification; outbound-only connectionHigh – origin of the measurement, location of local storage
Operator UI (browser)Display and inputMedium – no decision logic; tolerances enforced server-side

2.2 Data flow of a weighing

  1. 01Production order scanned; BOM comes from the ERP (myfactory or weclapp) via the site server.
  2. 02Position selected; container ID (Quant) scanned; server checks material against position. Refusal → audit trail.
  3. 03Measurement arrives serially from the scale via the station agent; no manual weight entry.
  4. 04Finish only within tolerance; server checks independently of the browser.
  5. 05Order: store durably locally → print label (barcode = record ID) → transmit to server → booking to the ERP (and WMS xstorage, where used) in one transaction → audit-trail entry.
  6. 06Proof of charging captured in the same record.

2.3 Interfaces

ERP myfactory with WMS xstorage, and ERP weclapp (implemented and tested); serial scales from Mettler Toledo, Sartorius, RHEWA and more, further manufacturers addable in the driver layer; ZPL to Zebra printers. Integration layer (ErpPort) implementation-agnostic; further adapters not available today.

3. Controls

ControlImplementationRequirement addressed (principle level)
Material check before weighingContainer ID against BOM position; refusal loggedEU GMP Ch. 5: correct starting material, check recorded
Tolerance enforcementServer-side: single weighing ≤ 104 % of remaining; position closure 98–102 %; warnings 50 %/95 %. Client displays, server decides.Manufacturing instruction; Ch. 5 quantity check
AttributabilityOperator, station, timestamp, scale per recordALCOA (attributable); Ch. 4
Originality/accuracyMeasurement straight from the scale; no manual entryALCOA (original, accurate)
ContemporaneitySystem timestamp at finish; "trusted timestamps"[Engineering: time source/method]ALCOA (contemporaneous)
CompletenessRefusals, licence checks, updates in the same audit trailALCOA+ (complete)
Consistency of sequenceStore → label → book; a label cannot claim a non-existent bookingALCOA+ (consistent)
Durability/tamper evidenceHash-chained audit trail; checkpoints for verification; no rotation, no editingAnnex 11 audit trail; ALCOA+ (enduring)
AvailabilityBuilt-in export for QA reviewALCOA+ (available); Annex 11 review
Failure behaviourWeighing in progress finishes offline, stored locally, booked idempotently; no new orders offlineAnnex 11 business continuity; avoids double booking and stale data
Software change controlEd25519-signed release manifests; signature → size → checksum before install; activation only without open weighing; update loggedAnnex 11 change management
Network securityStation agent outbound only; server the sole ERP interfaceAnnex 11 security
LicenceNever stops a weighing; 3-week warning, 2-week grace, then no new orders; offline-verifiableAvailability
Hazard informationGHS pictograms/signal word from material master on screen during weighingWorkplace safety (CLP, national rules)

4. Test evidence

  • Automated tests: hundreds across server, agent and UI[Engineering: current count, coverage, CI evidence].
  • Regression suite against production: reference fixtures from real operation since 2015 ensure that every release reproduces the proven bench behaviour – not just a specification written afterwards.
  • Failure tests: offline behaviour (finish, local storage, idempotent replay) demonstrated as a tested property[Engineering: test references].
  • Update verification: tests for signature check, size/checksum verification and rejection of tampered responses[Engineering: references].

Test reports and release notes are provided per version for supplier assessment.

5. Known limitations and open items (as of September 2026)

This list is part of the document because a qualification needs it:

  • Uptime and reliability figures are not published as metrics; operating history since 2015 on request.
  • Manual installation; signed Windows installer (MSI, code signing) not available.
  • Updates without automatic restart: new version takes effect at the station's next manual start.
  • Licensing off by default; never stops a weighing by design.
  • Two ERP integrations implemented: myfactory (with WMS xstorage) and weclapp; no further adapters today.
  • GHS pictogram set incomplete: GHS04 and GHS07 currently missing from the shipped assets[Engineering: status]. Display capability exists; full coverage is not claimed.
  • Migration from an existing terminal: methodology (pilot bench, comparison of records, cutover) is developed per project with the operator.
  • Electronic signatures / in-system second-person check:[Engineering: clarify scope] – until then the second-person check is governed organisationally (SOP).

6. Suggested qualification approach (GAMP 5-oriented)

  1. 01Supplier assessment: this document, test evidence, D-Automation's development and change process.
  2. 02User requirements (URS) compared against section 3; close gaps (e.g. second-person check) organisationally.
  3. 03Risk assessment: prioritise functions with direct impact on product quality (material check, tolerance, audit trail, failure behaviour).
  4. 04IQ: installation per the administration guide; document configuration (especially tolerance parameters).
  5. 05OQ: positive/negative tests at the station – wrong container, finish at 97 %, partial quantities, network interruption during weighing, label–record linkage, audit-trail export.
  6. 06PQ: pilot operation at one bench with a defined leading record; comparison with legacy/paper.
  7. 07Periodic review: audit-trail review, update history, licence events.

7. Glossary

See the separate Glossary page (English – German).

Version: draft 0.1, September 2026. D-Automation GmbH.